Window InstallationStormPlust and Structural Installations199700192013−03−01These instructions are applicable for the following StormPlus products:Cla
Fastening Methods (cont.)Figure 8: Exterior view, fastening through Ultimate Casementframes.Figure 9: Exterior View, fastening through UDH frames.Fas
Special Fastening SystemsStormPlus Ultimate Double Hung IZ3 Storm BracketsFigure 10: Fastening UDH Storm Brackets.WARNING: IZ3 storm protection for
Step 4: Final Installation ProceduresThis section does not include details on sealing installations that incorporate a continuous air barrier system
Continuous Air Barrier Systems − Preparing the OpeningFigure 14: Preparing the opening.The method shown below is Method A1 using a TYPE III flash pan.
Continuous Air Barrier Systems − Flashing the Installation1. Flash the installation in a weather boardfashion. For step by step instructions,refer to
Removing Interior Stops, Liners and FillersRemoving Ultimate Casement Stops and CoversSome structural installations that use the “jamb pinning” method
Removing SashUltimate Double Hung Operator Sash(a)1. Raise the bottom sash approximately 4, (102). Seefigure 19a.2. Pull the tilt lever (nested in the
IZ4 Notice of AcceptanceExact instructions for installing windows certified for use in Impact Zone 4 are not included in this publication. Theinstalle
PageTable of ContentsTechnical Installation Specifications 2...Before You Begin 3...
Technical Installation SpecificationsThe following details are specified for proper installation and for the unit to meet the advertised design pressu
You Will Need to SupplySafety glasses Hearing protectionLevel SquareHammer Wood shimsInsulation Tape measurePerimeter sealant1Sill pan flashingBacking
Step 1: Rough Opening and Framing RequirementsFigure 1: Preparing openings for concrete block openings.This section gives requirements for framing a
Step 1: Rough Opening and Framing Requirements (cont.)Figure 2: Preparing openings for concrete block openings.1Rough opening gap must be no more th
Step 2: Unit Preparation1. Remove the protective packaging from the unitand dispose/recycle properly. Inspect unit forany hidden damage and report im
Step 3: Installing the WindowFigure 6: Plumb and square unit. (Illustration shows both structural bracket and jamb screw installation.)The following
Fastening Methods and Jamb/Sill Screw ChartAlthough structural installations may involve fastening with wood brick mould casing or nailing fin, there
Kommentare zu diesen Handbüchern